BID# 2012-047
Bike Share System Components
Category:Goods and Supplies
Start Date:5/11/2012
Due Date:6/14/2012 2:00 PM
(UTC -07:00) Mountain Time (US & Canada)
The project will include, but is not limited to:
supplying, delivering and assembling a quantity of bike share system components
in the City of Aspen, Colorado and within the Urban Growth Boundary of Pitkin
County. The goals and objectives of a
bike share program are: reduction of PM-10 air pollution and reduction of
vehicle miles traveled in Aspen and Pitkin County’s Urban Growth Boundary. The
bike share program is intended to be used for short point to point trips
thereby decreasing traffic congestion, vehicle emissions, and the demand for
parking in Aspen’s core. The bike share
system should connect with and be complementary to existing transit services,
car share services and pedestrian connections.
The bike share system will be operated by a third party,
and this RFP is limited to system components only. Bicycles will be purchased
separately by the system operator, but must be fully integrated with the
station, kiosk, and docks to allow for system operations. All system components
must be integrated and offer expansion capability.
Notice of Federal Funding
Proposers are advised that the project requires the use of federal Congestion Mitigation Air Quality (CMAQ) funds administered at the State level by the Colorado Department of Transportation (CDOT) and at the Federal level by the Federal Highway Administration (FHWA). FHWA regulations, therefore, will govern the project’s procurement and contract process. The City of Aspen reserves the right to modify the RFP to address any concerns, conditions or requirements of the FHWA. Proposers shall be notified by Addendum of any such modifications and must notify the City of their intent to participate by email contact information to rebecca.hodgson@ci.aspen.co.us
Link to the program guidance:
http://www.fhwa.dot.gov/environment/air_quality/cmaq/policy_and_guidance/2008_guidance/index.cfm#eligpandp
Funding Break-out per Agency
Project | Federal | Local | Total |
City bike share
equipment | $28,977.00 | $6,023.00 | $35,000.00 |
County bike share
equipment | $165,580.00 | $34,420.00 | $200,000.00 |
Total | $194,557.00 | $40,443.00 | $235,000.00 |