Pitkin County Courthouse 2005 Space Analysis and Feasibility Study

Final 2005 Space Needs and Feasibility Study Survey Results

Facility Master Plan Documents:
Facility and Site Assessment Master Plan  In PDF format (5.8MB)
Facilities Master Plan Space Needs Program  In PDF format (4.1MB)
Facility Master Plan Conceptual Plans:
In Town Concept using Rio Grande and Zupancis Sites  In PDF format (2.9MB)
In-Town Concept with Public Works at FAA  In PDF format (2.9MB)
In-Town Concept with Chamber Site  In PDF format (2.5MB)
Out of Town Concept using FAA and RFTA sites  In PDF format (2.8MB)
Out of Town Concept using FAA Site  In PDF format (2.7MB)
Public Safety and Justice Center Concept In Town all other administration out of town.pdf  In PDF format (2.5MB)

BACKGROUND INFORMATION
Pitkin County Government operates from several different buildings located throughout the County, including the Courthouse Plaza Building (County Administration), Library, Courthouse, Jail, Health & Human Services, Public Works, Fleet, Airport, Senior Center, Landfill and two departments are located in other buildings (one in Aspen City Hall and another in the Town of Basalt).

These facilities are in different states of repair and have different requirements for long-term sustainability. This study will create a 20 year strategic plan to help us direct our resources toward facilities management that will meet the growing and changing needs of our community. Definition of Terms

The study will include an analysis of current and future County space requirements, interconnection between departments and the impact on efficiencies, development of facility(s) locations alternatives, a preferred alternative, development of a detailed financial analysis for each of the alternatives, evaluating alternatives and development of an action plan for implementing the preferred alternative. Scope of Work Flow Chart

Creating a strategic and successful facilities plan cannot happen in a vacuum. It must reflect and support an organization's unique requirements, goals, culture, philosophy and community. It must also fit within the timeframe and budget parameters of that organization, and it must be a living plan that will be a guide through on-going change over time. Facilities Analysis Process

It is essential to assure that the recommendations arrived at through the planning process are trusted and embraced by county residents. To ensure that the public is given opportunities to have input into, and remain informed about, the project and its outcome, we have integrated public participation into the planning process. Public participation provides the consultant team with a broader, deeper understanding of the issues, local knowledge, and perspectives.
Public Invited to Participate in Facilities Charette >  In PDF format ( 1.6Mb)

Pitkin County has contracted with RNL Design (www.rnldesign.com) based in Denver to complete the Space Analysis and Feasibility Study. RNL Design specializes in Master Planning, Programming, Architecture, Interior Design, Landscape Architecture and MEP Engineering.

CONTACTS Jodi Smith - Project Manager - 920-5396 - jodis@co.pitkin.co.us












Department Pages


Department contact info
76 Service Center Road
Aspen, CO  81611

Hours:
8:00am - 5:00pm (M - F)

Contact us via the web
Send E-Mail

 Phone: (970) 920-5390
   Fax: (970) 920-5374

employee list icon  Employee Listing

printer icon  Printer-Friendly
Department Information: